Best Value Always!

by Chuck Dutrow on January 1, 2009

We offer all phases of construction from foundation to finish. We also offer remodeling services from a bathroom or kitchen to the entire house. We have over 20 years experience in the rehab & construction business!

We have always worked to have 100% satisfied customers. We are a different type of construction company! We believe no job is too small or too large! We work to meet your needs! We love turning the worst house in a neighborhood into the nicest! Check out our portfolio above!

Help Rebuild Haiti!

YouTube Preview Image

{ 0 comments }

Locust St Complete!

October 16, 2009

This took rehab to the ultimate level, we redesigned the entire upstairs. We added a laundry room on the back, replaced the exterior doors and all the windows. We installed a new kitchen with awesome hickory cabinets, granite counter tops, ceramic tile flooring and stainless appliances. We installed a new bath with double sinks, ceramic [...]

Read the full article →

Locust St

August 6, 2009

Today I began a complete gut and rehab for Brian Beard of Priority 1 Properties. This is one of the worst houses we have seen this year. We plan to demo all the old plaster walls and frame new ones. We plan to install a newly designed kitchen and bathroom. We will install all new [...]

Read the full article →

Fairgrounds Ave Complete!

July 27, 2009

What a job! This project didn’t go as planned but we overcame every obstacle and the house looks amazing. We replaced all the windows, repaired all three porches & railings, installed a firewall, and re-coated the back metal roof. We installed a new kitchen with hickory cabinets, granite counter-tops and tile flooring. We repainted [...]

Read the full article →

Fairground Ave

June 3, 2009

This is an amazing home, the detailed woodwork is great. This house was stacked to the top with everything you could imagine. It took months to clear out and haul away everything so we could begin this rehab. We plan to patch the walls and preserve all of the wood. We will install a new [...]

Read the full article →

Rimrock Rd Complete!

June 1, 2009

Finished the strangest rehab yet today! We added another bedroom, bathroom and an office to this home. Now with 4 bedrooms, 3 bathrooms and an office this home is awesome! This house had the pink walls and black trim, we repainted it and it is amazing! We repainted the exterior and installed an awesome deck! [...]

Read the full article →

Rimrock Rd

April 18, 2009

This is the strangest house I have ever seen! Pink walls and black trim, yes I am serious. (check out the portfolio above)
We plan a complete repaint inside and out, new kitchen and add a bedroom, bathroom and office with french doors downstairs.
We plan to build a deck on the back of the house as [...]

Read the full article →

Jefferson St Complete!

April 15, 2009

We finished Jefferson St 3 bedroom 1 bathroom farm style house. This house is no longer the green candy cane! We installed clay siding and repainted all the trim white. We rebuilt the garage roof and support system and added a nice garage door. The inside was completely drywalled, painted and floors refinished. New bathroom [...]

Read the full article →

Jefferson St

March 2, 2009

Today we began a total rehab at 560 Jefferson St. This is a farm style home built in 1905. We called it the green candy cane! (check out the portfolio above) This house needs a major makeover! We plan to install all new drywall, repaint, refinish the hardwood flooring, install a new bathroom and kitchen [...]

Read the full article →

Wyoming St Complete!

February 28, 2009

Wow! What a job! We finally finished Wyoming St with a bang! Property was one of the worst rehabs we ever seen! We had to redesign this into an awesome 4 bedroom 2 bath place. We installed 2 new bathrooms, a kitchen with Corian counter tops and a butcher block, and the coolest upstairs loft [...]

Read the full article →

Wyoming Street

January 14, 2009

We started a complete rehab at 429 Wyoming St. This house is four bedrooms two bathrooms and was built in the 50’s. It has block walls, metal windows, and is completely trashed. We plan on installing a new beam in the living room, new drywall throughout and complete repaint. We will install engineered wood in [...]

Read the full article →